Presentation related to Seminar :
Indian Power Sector Scenario & Flexibility Requirements – Now & in 5 years
Financial impact of using existing thermal power plants for balancing intermittency of renewables
Indo- German Energy Forum: Flexibility Case Study at Dadri and Simhadri- an Overview
Flexible operation of Thermal Power Plants – OEM Perspective
Flexibility Requirement in Indian Power System
Flexibilisation issues of Coal fired Power Stations -NTPC Ltd.
Flexibilisation case study from Germany
Solutions & Best Practices for Hard Coal Fired Power Plants
Reducing Minimum Load of Coal Fired Power Plants
Report about the Flexibility Toolbox and Training Study
Economic Flexible operation & Adjusting operating regimes based on market conditions
Use of lifetime Monitoring for Flexible Plants Operation
Brief of NTPC Limited- The Main Sponsor of the Seminar